Anyway the installation will be face the problem about the location of pump as 21 design move it out to shelf area. Please see the red comment in drawing.
For all laboratory zone was designed at the beginning and I do already sent you all of lay out since 18 Jan 2016. To avoid unplanned additional cost. Thanks to talk to me if safety team want to do something in laboratory area.