From the past 4 AM step1-Part I still find that TPM range with SOC occurred; We still maintain that the condition has not, for example, which affect Line Precrusher Barmac, raw material, kg/m 1225 sweet to leak. Therefore, the target area development, edited by leak surveys and KAIZEN machines together with the PM to eliminate sustainable SOC.
การแปล กรุณารอสักครู่..