1. open the soil, digging depth ........ m.2. clean the head and cleaned holes stake /Snip of steel, approximately 40 cm long.3. place the soil Compacted ground. 4. pour the sand in order to adjust the level (Compacted sand) thickness 50 mm.5.50 mm thick Lean Concrete pouring6. check the integrity of the stake with the wave measurements (Seismic Test) (not working) 7. check the steel Footing of structure.8. after class, consisting of a Lean, dry, iron and steel poles, tomo Footing and then pour the concrete floor (Footing).9. wait for dry Footing and then structure the sheep sent to the breast.
การแปล กรุณารอสักครู่..