The project is to bring academic knowledge of industrial engineering who studies to applications in the process. In order to rectify and reduce costs in the production of clay brick. Ban Nong flow as a product that can add income to the family, which studied the problem of brick production process. Start by exploring issues caused by cause analysis with Fishbone chart. Found that there are several production steps, the step has caused the fault scrap from scrap lumber into grass mingle with the ingredients cause waste clay brick. Another case is that the worker was not wearing protective safety equipment. Pasting tools or production equipment is not organized by reckless may result in accidents at work. Therefore, those projects have therefore resolve their problems, to reduce waste and reduce accidents in the work of the worker. By offering safety training in the manufacture of brick, and is closely monitoring the results. Clay brick production throughout the period of the worker is to correctly and safely. Operator attention and accidentally occur in the performance of duties with efficiency, which results in productivity, quality and all of our waste clay brick production decreases, and reduce the cost of production as well.
การแปล กรุณารอสักครู่..
