On August 5 in 2015 with tanks, underground tanks, and 3.4 cm in 2015 in August 6 contractors. The financial business has made the correction is carried out on the tank ground ใตั viewing.
On August 5, 2015, with the water in the tank, 3.4 cm in underground tanks and on August 6, 2015 the contractor. Business is conducted by the the View hosts the underground water in the tank.
On 5 August 2015 water in the tank 3.4 cm in the underground tank and on the 6 August 2015 contractors. บิสสิ ness, editing is performed to see water tank ใตัด min .