1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 contractors company to choose the operation at least 1 people supervisor
3.3. The training content in the control plan the performance and detailed MSDS of chemicals to the employees by the Department of security company
3.4 practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.5 various electrical equipment used to test condition. The sticker passed state from maintenance. And allow the use 3
.6 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3.7 work up a concrete สวมใส่อุปกรณ์ PPE with predetermined standards (WI-SR-001)
3.8 installed on the Anchor pads to prevent his
3.9 case is a pun on high to have ใช้นั่งร้าน. Or stairs, proper operation and wear Safety Harness strap line and saved all the time ฏฺ diseased performance
3.10 after work every finished cleaning area to clean all the time. Storage equipment and order
3.11 provide scaffolding ladder or safe in the modelling ปูนบน higher
3.12 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
-
3 cement mortar shooting task.13 wear PPE device with standard prescribed
3.14 air compressor must have a card (Guard) cover pivot point, and through the detection of sticker condition maintenance. And allow the use 3
.15 inspection equipment up voltage line voltage various joints in good condition are available, and are equipped with cable box (Whip Check) pressure joints all joints already
3.16 requires the installation of the tray concrete mixer. To accommodate the pieces of plaster dropped
3.17 specimens can spare BLUE SHEET while cement to install BLUE SHEET
3.18 work shot mortar - dress mortar must be surrounded BLUE SHEET or canvas. To prevent dust dispersion mortar
3.19 case is shot mortar - cement on high requires the use of scaffolding. Or stairs, proper operation and wear Safety Harness strap line and saved all the time ฏฺ diseased performance
3.20 in mixing mortar. Take care of the water used in the cement to flow working area
3.21. After work done every time to clean up the area to clean all the time. Storage equipment and order
3.22 provide scaffolding ladder or safe in the shot mortar - cement on high
3.23 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
3 wedding mortar.24 wear PPE device with standard prescribed
3.25 installed BLUE SHEET or canvas, to prevent the spread of lime dust caused by the decoration mortar
3.The case is composed 26 plaster on the higher requires the use of scaffolding. Or stairs, proper operation and wear Safety Harness strap line and saved all the time ฏฺ diseased performance
3.27 after the mortar out to store wood with nails stuck to regulation, cleaning area to clean all the time. Storage equipment and order
3.28 provide scaffolding ladder or safe in the dress on high lime 3
.29 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..