1. caused by not doing the work in stages, clearing the end Line and start producing the next.2. due to the number of container does not define the job that is specified in the order.Caused by the quality control staff do monitor PO206665 231-231 56-101, PO206668-56-101 Pcs based on a total of 1215 from the production control sheet which has been received and verified by the fact that received but when packing until the last step. I found the job OK and NG 1172 Pcs total Pcs total pcs 1215 43, but when PC check box, and then working on the cover, found a job. 1 Pcs. Handling for accident The quality control staff and supervisors and manager level have no 231 Part-task 56 Recheck-in room 101 at the heart Finished found that filling the front page box, but when I check the task team found that orders OK + NG. A total of 1216 1 pcs. pcs and recheck data count NG found a side job that is all based on a production order. To solve the problem.1. konopnakngan close the box after packing and level head who is a Supervisor or Staff will check the contents of the way closed box to send them to the Finished room room. 2. place the checking task line before clearing the next, with the responsible employees and head up to the inspection before the job runs in the following order.
การแปล กรุณารอสักครู่..