This thesis aims to study the function to reduce production time in the industry. Case Study filter waste products M9 type of case studies. By decreasing the time wasted in the production process. This thesis starts with the study, analysis and data collection to determine the cause of the problem. And define the solutions adopted. Using techniques including industrial engineering. Study work Chart shows the process flow of the sub (Flow Process Chart) studied how to work. Then take the time to analyze the survey results to determine the cause and ways to improve, to reduce the execution time of each piece is going to lose a lot of time to improve performance by changing the way the original. reduce time to run down the
result of the improvements can reduce the running time down to 2935.20 minutes per barrel from the same time in producing filters waste products of M9 from 39 days per barrel decreased to 33 days per cylinder for enhanced performance. up 15.71 percent from the same four-cylinder production spent 156 days after the renovation work time reduced to 131.5 days.
การแปล กรุณารอสักครู่..