His Majesty THB His Majesty the King on 19 February 2532 to study the suitability of irrigation dam catchment river. Hastily To solve the problem of water scarcity To benefit farmland and alleviate flooding occurred regularly in Pasak. A sequel to Bangkok. Metropolitan and with At this stage, which led to rat almost every year. Subsequently, on December 4, 2536, His Majesty the King's royal speeches. On the occasion of the celebration of the season. On the development of the water resources of the Department of Irrigation. If the operation from the present It can solve the problem, floods, droughts and water shortages to the public. To construct the dam two of the river. And dam The Cabinet has approved the operation on May 3, 2537, this project during the construction period of 5 years from 2537 to 2542 and King. Have mercy graciously signed the dam. "Wild Jolasit" means "river dams that store water efficiently,"
the dam is the longest in the UK. Due to the initiative of His Majesty. To solve the problem of water scarcity and alleviate flooding occurred. Gracious royal name. "Wild Jolasit" as a source of water for agriculture. Fish breeding large freshwater fishing.
การแปล กรุณารอสักครู่..
