1. Do not light a fire in the area of bulk solid is strictly prohibited.2 face must be small, should not have to open the front headquarters. Planning and jobs to eliminate properly and implementation plan.3. The thickness of the solid waste in landfills. Should not be more than me, thickness of 50 cm, and there will be การบด compression.4. There is a veil over the soil thickness for about 15 cm except the last layer that is divided into two stages with soil thickness at least 60 cm.5. Systematic collect rain water separator and waste arising from the bulk to handle properly.6. Access roads in good condition, able to use every season.7. The fence surrounding the area bulk disposal and the entrance gate.8. The data record into the area of waste disposal.9. Quality monitoringThe officer. The right equipment in operation.
การแปล กรุณารอสักครู่..
