There are no electric utility functions fixed by assets through soil far from land, property, approximately 1900 m from roads mueang-Mae phrik (thon. 1251) and away from the mine, about 800 meters of public interest.
There is no public infrastructure through the land away from the fixed assets by an electrical Property Land approximately 1,900 meters from the road under the flower-mae phrik (chapter, .1251) and approximately 800 meters away from the mine public