"Contractors" to improve the system, the system can be easily repaired, according to the contract, was completed within the period of 15 days, from December 13 to December 27, according to the job table 2558 2558 Shut down, according to the document, 2/2558 (2015) og recycling companies dacha Bai corrective time nachamkat 03 September 7 2558.
การแปล กรุณารอสักครู่..
