Because the order came later and there was work on the table. As we have previously informed, we need a production time of at least 45-60 days for air drying and must check the production plan during that time.
Due to later orders and workbenches, as we mentioned, the workbenches require at least 45 to 60 days of air drying production time. Simultaneously check the production plan.
As the order is late and there is a workbench, as we have informed in the past, the workbench needs at least 45 to 60 days for air drying, and the production plan during this period must also be reviewed.