GENERAL INFORMATION [solve]
the date of construction: October 1 , 2527
day open to traffic: December 5 , 2530
the company makes the construction:Hitachi zone Zone Corporation Tokyo Japans top Co. , Ltd. and the Company. b. Limited
construction cost: 1,418,100,000 Baht
of a bridge: Types of horizontal pillars stretched single
high from the sea: 41.00 meters
the length of a bridge:782.00 meters slope of the bridge
Bangkok: 1,127.00 M 2
of the bridge ramp terminus: 807.00 meters
as well as all the length: 2,716 meters
number of lanes: 6 lane bridge
width: 33.00 meters