Mr. universe and Mr. Narong milieu to install Thickener tank Over flow pipe at No.3 while working to oust head of Thickener tank edge slip occurred, broken, bleeding head.
Mr. Universe and Mr. Narongrid To install a water pipe Over flow tank Thickener No.3. while working the slippery Head hitting the cylinder head cracked Thickener bleeding.
Mr. universe and narongrit, install water Over flow the tank Thickener No.3 while working slipped, the head ระแทก edge Thickener tank. Make head bleeding.