Act LOI submission and prepare contract signed in order to reserve space in Phase 1, the space reserved is C5 for pipe production and Cut a Bend area rent & 65 USD/sq.m.
The filing LOI and prepare the contract for reserve space Phase 1 area will book is C5 for factories producing pipes and Cut & Bend the area for 65 coins / m2.