PA SAK basin development began since the construction of the dam, 2558 (2015) 6 phraram when the only solution of water shortage due to the development and expansion of economic and social development is not too much. But later, when many more people. Agricultural areas have been expanded and developed countries in the various aspects of extensively as a result cause water shortages because of the people in the watershed. Water used by saving with the flood season The PA SAK River basin and the Chao Phraya River basin at the bottom, often experiencing frequent flooding and some severe damage this year like the year 2538 (1995) Government turned to pay attention in the development of the PA SAK basin urgently. PA SAK basin is a large basin and the Chao Phraya basin is an important branch of the. With a watershed of approximately 14, 520 Square kilometers and an average annual runoff is about 2, 400 million cubic meters, but since this watershed characteristics. There is a high slope results in rainy season. Colorful, flowing water flow from the top down fast. Overflow of flood Bank and concentrated damage to farming, as well as the House and property of the people annually. Affect the area in Bangkok and surrounding areas as well. On the other hand, In the dry season, often experiencing shortage of water is used for agriculture, although it receives water from the Chao Phraya River to help but it is still not enough.
การแปล กรุณารอสักครู่..