Dear owner of the company.Because in the past the company May 9, 2016 Lite contact company representatives to survey the structure building inside SOI kingkaew 25/1 by a need to check the. The structure, floor that is strong enough to support the weight machines or not. Our company has sent into space on May 11 survey engineer, 2016, by examining the structure required to calculate the strength of the ground. The company therefore requested Lite structure from your agent, your agent is informed that there are no such documents, and cannot, see. The company therefore Lite says if there are no such documents, it cannot calculate the strength of the floor. The company reported that the Boss wants to know the details of the structure, see the scan in a curious steel reinforced concrete structure. The company admitted to supplying the machine scan May 14 in the 2016 polls and analysis. Summarize and report delivery, bringing both hard copy deliveries and soft file. Your company representative on May 18, 2016 2016 surveys on May 14 in which the company has been structured from Lite representative of your company, which in May 11, 2016 States that do not have and cannot see.Surveys of the building structure, especially in comparison with the As-Built structure of the companies found that such building Lite is more adapted building structures which make use of a building differs from the original design.1. the roof deck and the water tank are placed in the roof floor structure is designed to use it.2. the 3-floor and 2nd floor have more extra bathrooms. Which does not meet the original for permission to the District Office, which will affect the strength of the structure, the building company has made a notification to the Lite with your agent and took a walk see the crisis spots suggest how to fix it.The way your agent telling me that wants me to continue the analysis of building structure with the Edit method, the structure which is further requested in the first episode, and the most urgent request. The companies inform Lite and costs THB 35000 quote.On May 24, 2016 received a wage survey and scan. The structure, floor 45000 baht but did not receive an additional segment cost 35000 baht.On May 24, 2016, the company has made shipping Lite report structure analysis method of building was reinforced, a structure which is more that request May 14, 2016.During the process, the company has made a name query Lite partners building owners thereof. Call the document Scope of employment contract, TOR, but does not work, any information from employer.
การแปล กรุณารอสักครู่..
