1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.Check the 4 hammering code And the hammer used to have a good condition before starting operation
3.5 equip PPE with standard according to specifications (WI-SR-001)
3.6 use stretch devices capture hammer instead handed
3.7 hammer used in stamping code contact must be smooth, not blunt, rounded
3.8 provide scaffolding, ladders, or the seat proper to Marking. The target 3
.9 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..
