To drain into the trough water drainage including around the project area. The conduit project, is the size of 0.3 meters x 0.3 meters can accommodate water 0.0855 cubic meters per second, the trap oil 1 pond. Can accommodate water 0.0668 cubic meters per second, as shown in the attached document 1 (in the report more detailed explanations of the 1) it can be seen that the drainage trough surrounding the project area. Oil trap and the installation project.
การแปล กรุณารอสักครู่..
