Because the company TAC has been pouring bopdap pool fire by water pressure, but do not have to close the filling plug fire. Cause water leakage in the COFERENCE and has damaged the work and materials. 1. ceiling work. 2. decorative wall. According to the attached image. KIM, you are notified via J-DESIGN, waiting for the correction of the company TAC. Complete and J-DESIGN job content summary that is damaged. As a replacement, and Further corrections.
การแปล กรุณารอสักครู่..
