Because the PA SAK jolasid dam construction. On the path train, subway and rapid beats during Tiger's railway station ranarai railway line (formerly), which is located below the dam's water catchment level. The Thai national rail To move the path trains that will be submerged up to the dam along the area where the train stops to promote tourism, construction has begun on April 25 14 months spent 2540 (1997) was completed on June 15 2541 (1998) rail.The move, the new building adjacent to the reservoir's total distance 24 km long when finished, start with the bus over the route, which will see a train run on San Accelerator aside along the edge of the dam reservoir looks like a train running across the surface of the water, until the locals, known as floating train along side 2 side views are magnificent train.