Due date 18/09/2558 (2015) company limited Sha lame c power towers. Meeting point has all details and send the Task Report 3. Successfully.Therefore conclude as together as follows:1 lure Lightning) The front of the factory. As you Georg.Wagner Need to do is quote the job lure lightning system installed new. Based on the samples, and the Saudi company blue lame lure c power co., Ltd. Has been installed, with the company limited to Beurs khoen-Lai consideration.2.), quotes installation 2 1 jacks (jacks is a Socket).3) device that detects deterioration and breakdown of the use of the work (according to the documents, tasks. P.M. has to deliver, it is quite rare in) by the market. But to use another access to yi But it does not remove a manufacturer in China.4 TR.630 kVA and ground systems) MDB PANEL. Preliminary appointment date 29/08/2558 (2015) Will continue to improve the system of ground-based editing.