This study is intended to increase the effectiveness of dried fruit-producing plant with technical factory planning systems. By improving plant layout is based on the principles laid the factory system. Which is a way to reduce the distance and time in moving to each process, including improving plant layout taken from performance measurement to use simulation with arena?In the design of the plant layout. Be used as a flow chart for evaluating the nature of the work in each process and concentration in the flow, then create a new factory by creating a map, diagram relationships of each activity. Summarizing the results of the relationship in each process. Afterward, using the method Total Closeness Rating and built a new plant layout both bring to the evaluation with the arena could also be reduce the distance down 36.77% and reduce time of 31.92% moved in each process. 31.06% and 40.55% and, when measured by the amount of increased productivity observed in plant layout 1 and layout 2 plant will be increased productivity approximately 18.88% 17.48% and per day. The results from modelling, therefore, concluded that the new chart factory, both able to reduce the distance and time of movement in each process and increase productivity and results more clearly.
การแปล กรุณารอสักครู่..
