Warranty status will have been operating for a period of 8000 hours under normal operation and the type of. Biomass, as specified in a Proposal for their Fuel Analysis Data
.The crash is caused by reasons beyond the control of the power plant will be treated as a guarantee the State
.
การแปล กรุณารอสักครู่..