Working since the change of system of e Asia We have to work twice the increase is 2 times on the same task, which it repeated so much. The problem is we don't have enough time to manage work time.
Since the change to the system of E Asia. We need to work as a two-fold increase was two times in the same work. It redundancy Our problem is not enough time. The deal was completed on time for work.
Work from change system use of EA. We have to work 2 times increase is working 2 times. At the same event, which is redundant. The problem is we don't have much time. To manage to get the job done in time.