The construction project, which resembles this duplication can be compared to the production of industrial goods. By each item would have to move to a different point, so people have to work until he was finished. Construction project section that resembles the repeated movement of the resource to work on each part, there may be a fee for the same style of nangan SIM that is not equal to it.
การแปล กรุณารอสักครู่..
![](//thimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)