Because there will be external contractors. The rope Ying LAN to repair leaks, window borders, A building, B and C July 2559 since Monday-Friday 9.00-17.00 hrs.
Due to external contractors. He swung the rope Zealand to repair leaks windowsill buildings A, B and C during the month of July 2559 from Monday - Friday from 9:00 to 17:00 pm.
Because be the Contractor from the outside. In the talc shoot Sealand to repair the leak window, building, and A B C during the months of July 2559 from Monday to Friday. Time 9.00 - 17.00.