Check list for the replacement of the cooling system of the existing system
1. Make เย็นระ system: a substance or ammonia grew directly or floods. (pump)
2. Methods: air-cooled cooling or water-cooled
3. How defrosting:Water or hot gas
4. Insulation panel: the thickness of the material
5 unit cool: material of coil
6. The temperature of each room
7. Working conditions:? The high and low pressure oil pressure etc.
.* if the customer wants to compare the energy save NH3 / CO2 we need to know all the details of equipment requirements for a new system
, 1. The layout of the factory (description length x wide x high)
2.The position of the engine room (if the production capacity, size and load)
3.? The position of the condenser and the load is the wind
4.? The temperature of each room
5 necessary product details, heat, number of tons / day
6. Of insulation panel PU or PS
7.The size and the quantity of the door to load location
8.? The details of the water used 9,
. The structure drawing of the existing building. (need to be able to support the weight of the unit cool).