Group name: 30 M/O lucid Production yet.Topic: reducing the transit time between the end of Line – head Line.Problem: pallet circulation in Line with Bottom Sub section 40 a head Line up when the Rabbinic Assembly Parts put on the production line to the end Line flowing, it will wait for the forces placed on the cart. When the pallet Line head, Line head, all employees that it will need to remove the empty wheelchair Sprint cars at the Palace, and then to have the comforting use causes a loss of production from the Palace to push turnover to a format.Solution: change the turnover at the Palace installed under the conveyor belt production line. When thawing Palace on the production line to the end Line, it will agree to the conveyor belt below the head Line back to Sprint by a head Line that the employee does not want to push the car ran put Palace employees and use the new format to the end Line, it does not need to store the Palace thaplao shopping cart.The fix: header Line employees must push an empty car to change the cars have jetted back to Stargate Palace at the head of around 305/month average Line in the distance to the end of the Line from Line 8 m take 0.75 min/round.FIX: after the Palace from the end of the Line come the thamun merge header Line by a conveyor belt below. The employee does not want to push the Loei Palace Hotel pick-up list.Summary: 1. reduce the time wasted in conveying that back Lance Palace head Line 229 minutes/month average 2. make available the work sites. Don't waste space to park the cart 3. head Line employees does not create production amounts to make a wheelchair can bring other applications.
การแปล กรุณารอสักครู่..
