Bhumibol dam dam Phu Mika phon is a multi-purpose dam, the first of its kind in the country, Thailand. The concrete dam is arc style. Start to finish – 2496 building opened May 17, 1937, when this dam was a dam project 2507 Hi. His Majesty the King has ponmaphithai as thanop RA dam that Bhumibol dam when July 25 2500 (1957) [1]Bhumibol dam creates a block Ping at Khao kaeo River district Tak province with three sleek 250-metre radius of the curve height 154 meters long, 486 meters, width of 6 meters, reservoir dam San can accommodate a maximum of water 13462 million cubic meters. Bhumibol dam is a curved dam, the world's 8th largest [1]His Majesty's Royal laying tank. When June 24, 1937, the first phase of construction in 2504 consists. The construction of dams, electric power plants and transmission systems. His Majesty's Royal tank opened the dam. When the 2507 May 17.The authorities established control over the construction, maintenance and administration of Bhumibol dam in 2500 is a State enterprise named "Yun Hi-power", which later was merged with the State Enterprise "lignite" and "North-East" power electricity generating authority of Thailand (EGAT) Governor – the first is 2511 is Mr. Kasem. Java Semitic wanit
การแปล กรุณารอสักครู่..
