It is based on the time it takes to fix the design document, which if it goes wrong, it is more and more time fixing Document of errors to score (score 1-5) by the score but I'll miss the most is through fasting. And score lower level, it would be a mistake to drop. By the time they have been modified to make the design document to editing. indicator that Can Keep Company must have requirement from customers is accurate and complete or Not.
การแปล กรุณารอสักครู่..