5. coordinate transportation Push the cost include a number of times in a row from the query information, passenger transportation as that require coordination and resolve any issues that occur all the time, so the average is approximately 5400 Coordinator times per month.6. to save the report, transportation Push the costs include the number of times Report preparation, transport employees must have all passenger. To be collected, recorded, as historical data for Executive reports by report transport equals 5400 times per month.7. to check vehicle availability Push the cost include a number of times from the query, the driver will make preparing a car before, every time the car will. Push the cost, which is approximately equal to the sightseeing transport vehicle is 5400 times per month.8. time stamps Push the costs include the number of times the query from the driver. In the time that the bus driver will be required to sign the register every time that the dock access both incoming and outgoing traffic equal to 10800 times per month.9. the dock waiting for passengers. Push the cost include a number of sightseeing from the query information about drivers and employees to leave the car. Found in the harbor for passengers in each of a number of passengers. Push the cost, so the number of sightseeing bus is the dharwad 5400 per month.10. driving transport. Push the cost include: The number of minutes from inquiries and observations 1 driver. man made a run, the shuttle is about 4 times a day by jointly with all 45 cars, so the car. Driving, transport, there pushing the average cost of 5400 rooms per month. When analysing the cost push and push, the number of such costs can be expressed as: table 5 as follows:
การแปล กรุณารอสักครู่..