Project monkey cheeks due to initiative
One theory is to solve the problem of flooding along the way to overwhelm flood management (Flood management) throughout the past period. His Majesty the King, he is aware of the serious threat of the flood crisis in Bangkok. Several reasons, such as to accelerate drainage to the sea through the horizontal Canal East of Bangkok. Add green areas to the expansion of the city and into a drain to flood season, the flood protection system construction. To the catchment draining into the temporary drainage;
.
When is 2538 (1995) initiative "project monkey cheeks" when November 14, 1937.2538 (1995) to procure catchment based on various spots in Bangkok to accommodate rain water temporarily. When it's time to ditch drainage could come from drainage to prevent stored away. It can decrease the flood problems.
.The concept of the project monkey cheeks
Due to his Majesty the King There is even a monkey-banana mixture into her cheek bulge has large increments so there "ratkrasae explains that" monkeys in General if we sent bananas, monkeys will quickly Peel. Remove to the mouth chew The monkey to do this until all banana comb or full cheek bulge. And then gradually bring out foreigners and swallowed afterwards. "this initiative with a horizontal project, cheek monkeys up
.
The supply and design of monkey cheeks
. Design considerations in the area of water catchment areas or downturn will need to know the volume of surface water to be entrapped and surface flow rate that will allow discharged during rain. The most important thing in supplying space monkey cheeks is supplying water to slow down area (catchment area) by the need to provide sufficient space, entrapped in order to control the flow rate out of the area, slowing the water catchment area. That will not cause a problem to flooding in low areas or public drainage systems
.
Project objectives: 1. to develop monkey cheeks
groundwater for the consumer and to agriculture as part of the project
.Due to his personal project or initiative project, so that the people in the project area, the better.
2. To study estimates the potential groundwater groundwater development and information flows to the project due to initiative and establish surveillance monitoring networks. For the management of groundwater sources, etiology
The category and size of the monkey cheeks
1. Large monkey cheeks is a large lake or pond that collects rain water from the catchment area will be kept for a period of one before it drains into the river. To create a water catchment area or a downturn, there will be several categories: Dam reservoir which agricultural field characteristics of these buildings would have to have another purpose contains, such as irrigation, fisheries etc.
.2. medium-sized monkey cheeks is slow and smaller than a large monkey cheeks which had
construction in basin. Natural areas such as swamps, mainly swamp canals etc.
3. A small monkey is monkey cheeks cheeks that are smaller may be public areas, children's playground, parking lot or golf course in the House, which is connected to the drainage system or canals
.To solve the problem of flooding in the greater Bangkok area along the initiative "monkey cheeks"
looks and how it is as follows:
1. Continue to drain out of the area, flowing canals and the large water area of the sea.
2. When sea level fell below the water level in the Canal was made to drain from the Canal using Earth's gravity theory. (Gravity Flow) by nature.
3. Water pumping out of the canals that serve as "monkey cheeks" to make water flow at any time on your own effect. As a result, much less area to flood.
4. when sea level is higher than the water level in the canals, close the floodgate by adoption
.Water flows down the only way (One Way Flow)
3 main issues that project performance is monkey cheeks accomplish the initiative.
1. consider places that will serve as the pond and how to pull the flood flows into the pond's water.
2. The path that water flowing into the drainage pond water source at acting.
3. drainage from wells and continuous water
.From the above principles. To meet the initiative's operations based on the use of natural lake or swamp canals empty space used as a water source, water wells and water into the pond and. A study of performance and determine the format of the project can be divided into 2 parts:
.
1) e. monkey cheeks project of Chao Phraya River. Receiving waters in an area east of the River since the Ayutthaya, saraburi province. Pathum Thani, Nonthaburi, Bangkok as the cable Canal. Acting as the pond water or just water and swamp lagoons or the empty space as appropriate as well for more water and using a natural Canal in the North-South Canal, he Nui Chai chit. Khlong bang PLA Klong Dan Some Canal shopping Canal beach is draining in and out of the water just ponding
.
2) project in monkey cheeks West side of the Chao Phraya River. Receiving waters in the area
The West side of the Chao Phraya River, from the province of Ang thong, Phra Nakhon SI Ayutthaya. Samut sakhon, pathum Thani, Nakhon Pathom and Bangkok to Sanam Chai-khlongomhachai and river. To paint out to sea at Samut sakhon
.Project monkey River lower cheek are effective, now complete, end-to-end project 3 system must perform together is
1. Project monkey cheeks "river bottom episode"
2. Project monkey cheeks "khlongomhachai-Klong Sanam Chai," he said.