PA SAK jolasid dam is a dam, soil water retention, the longest in the country by Thailand's King Bhumibol Adulyadej to prevent flooding. Construction started in December 2, b.e. 2537 irrigation Department is responsible.
Pasak Jolasid Dam catchment, the longest in the works of the King to prevent flooding. Start construction on 2 December 2537 by the Irrigation Department is responsible.
Bougainvillea. A storage dam water has long works of his majesty to prevent flooding. Construction started in the 2 September 2537 by the Department is responsible for it.