Requirements in the revised 1. Repair as well as increase that fell in front of the damaged well 2. Sheets-tating For standing work, connected to a strong permanent 3. Stand space work stand out in front of another 50 cm 4. New painted yellow in the structure
Needs improvement 1. Repair the damaged rail Add front rail 2. Plate Gate fittings for standing work. The attached cells fixed 3. Work space stand standing out front by 50 cm 4. painted yellow structure.
Needs improvement 1. Repair the flagship damaged. Add flagship front 2 sheet เกตติ้ง for standing work, connected to a permanent, 3 Increase the area of work standing standing out front in 50 cm 4Painted yellow and structure