2) Employees applying grease misaligned (not around rsw botton) 3) found the process to cancel to (process cuttonbut pressure - led window) in operation standard 4) the employee is not rotating jig for lock parts before assembly.
2) employees to Grease an position (not the RSW botton) 3) Process was cancelled, (Process pressure cuttonbut- LED Window) in Standard Operation 4) Jig piece to Lock non-employee job before assembling
2) employees painted Grease wrong position (not around RSW botton) 3), found the Process canceled (Process cuttonbut push- LED Window) in Operation Standard 4) staff does not turn to Lock Jig pieces before the