-Provide guidance for utilities Operation using machine tools. -A maintenance plan, tools/machinery and preventative initiatives improve centralized utility systems. -Responsible for the pressure control station maintenance and bang PA-in industrial estate natural gas quantity measurement and kas pipe system. 2. Management and administration -To support the implementation of all areas of activity in order to meet the goals, objectives and work plans. -Manage and control the cost of resources used in the operation. -Responsible for the power management of the bang PA-in industrial estate. 3. quality. The environment and security. -Operational control, quality requirements and standards. Does not affect the environment. -Collect data. Tracking environmental issues. The case does not meet the requirements to offer: bosses. -Responsible for the operation respond emergency response equipment including emergency.Apr-Jun-2558 (2015) 2558 (2015) Position: engineerThe owner of PTT natural gas distribution co., Ltd.The project cut natural gas pipelines system, separate 4-inch size, and gas station demolition MRS quality construction, radak limited.Responsibility for coordination of the relevant organizations and external agencies have been delegated, verified. Supervision of centralized utility space, work progress report on supervisory, administrative work, quality. Safety requirements and standards, monitoring, and other documentation, audit jobs, improve public utilities space returned.2558 (2015) Mar – Jun 2558 (2015) Position: engineerA project to install traffic lights in front of nikhom bang PA-in.Responsibility for budgeting work, make a plan for the project implementation, monitoring and review, to approve the work, review the list of components and materials prices, check out procedure before performing tasks, supervised the installation of the device, the task progress report to bosses, verify the installation of the device and tested usage, work management, quality. Safety requirements and standards.Dec-2557 (2014) – Jan 2558 (2015) Position: engineerA project to install fire alarm systems factory finished size rental 2000 square meters.Responsibility for budgeting work, make a plan for the project implementation, monitoring and review, to approve the work, review the list of components and materials prices, check out procedure before performing tasks, supervised the installation of the device, the task progress report to bosses, verify the installation of the device and tested usage, work management, quality. Safety requirements and standards.2557 (2014) Nov – Jan 2558 (2015) Position: engineerDeep-well water supply system improvement bang PA-in industrial estate.Responsibility for planning operation, review the list of components and materials prices, check out procedure before performing tasks, supervised installation of equipment (pumps, pipes) The test controller to work. The leakage, the task progress report bosses, check the devices, installation, technical support and engineering.Sep-2557 (2014) – Oct 2557 (2014) Position: engineerStructural improvement and bang PA-in industrial estate incinerator system.Responsibility for budgeting work, project implementation plan, review the list of components and materials prices, check out procedure before performing tasks, supervised the installation of the device, the task progress report to bosses, verify the installation of the device and tested usage, work management, quality. Safety requirements and standards.Jun-2557 (2014) – Dec-2557 (2014) Position: engineerImprovement repairs finished factory for rent size 2000 sq m.Responsible for the project implementation plan, budgeting work, review the list of components and materials prices, monitoring and review of the audit work, to approve the procedure before performing tasks, supervised the installation of the device, the task progress report to bosses, verify the installation of the device and tested usage, work management, quality. Safety requirements and standards.Mar Apr-2557 (2014) 2557 (2014) Position: engineerStructural improvement and bang PA-in industrial estate incinerator system.Responsibility for budgeting work, project implementation plan, review the list of components and materials prices, check out procedure before performing tasks, supervised the installation of the device, the task progress report to bosses, verify the installation of the device and tested usage, work management, quality. Safety requirements and standards.Feb-2557 (2014) – Mar 2557 (2014) Position: engineerThe owner of PTT natural gas distribution co., Ltd.Project-split cutting system 4-inch size, natural gas pipelines and gas-station demolition company MRS Tracy heard (in Thai) co., Ltd. -Repair of the road trend natural gas pipelines and natural gas valve inside the bang PA-in industrial estate.Responsibility for coordination of the relevant organizations and external agencies have been delegated, verified. Supervision of centralized utility space, work progress report on supervisory, administrative work, quality. Safety requirements and standards, monitoring, and other documentation, audit jobs, improve public utilities space returned.2556 (2013) Jul – Dec 2556 (2013) Mechanical engineer positionThe owner of PTT natural gas distribution co., Ltd.Construction of the project, the project system of natural gas pipelines, size diameter 4 inches to afford gas to t c h Hotel Suzhou co., Ltd. Mie.Responsibility for coordination of the relevant organizations and external agencies have been delegated, verified. Supervision of centralized utility space, work progress report on supervisory, administrative work, quality. Safety requirements and standards, monitoring, and other documentation, audit jobs, improve public utilities space returned.Mar 2555 (2012) – Jul-2555 (2012) 2556 (2013) Apr – Jun-2556 (2013)Mechanical engineer positionStructural improvement and furnace systems (b)
การแปล กรุณารอสักครู่..