And before the field staff collected data should actually be called the Pilot Survey Pre-test, which is to leave the field. However, the sample size is less than the Pilot Survey was to determine the perception of respondents to the question. When the defects will be corrected before the actual field work.
การแปล กรุณารอสักครู่..
