Proposed guidelines and technical methods of structure for projects on AMR/AMI (Pilot) to Modify more than substitute.A. need to know if the water is not flowing (water is not for sale, because MWA)B. need to know if it was flowing water than usual (maybe because of the leak.)C. water meter reading more than once a month through the system, etc.D. the customer has selected the Option to obtain the service (additional charge)
การแปล กรุณารอสักครู่..