Filling and even override a cable that is not embedded in the concrete, sand or materials must be used. As stated in theThe cover up is transcribed in the houses when the crusher, each layer must be thick not exceeding 15. Cm and transcribed, CrusherTight not less than 85% of the standard (the STANDARD PROCTOR TEST) tightly.
การแปล กรุณารอสักครู่..
