Office of the Energy Regulatory Commission of environmental monitoring in accordance with the Code of Conduct (Code of Practice)
Document No. (Case Number)
- - -
Date of the recipient
on the full document. A literature review
(see the Code of Conduct (Code of Practice) income for the power plant with a production capacity installed less than 10 megawatts of electricity from biomass)
--term action - CoP precautions. and impact the environment first. Control the rate of pollutant discharge from the chimney 2. Dust control from transport fuels 3. Fuel storage area management 4. Quality control and supply fuel 5. Prevent the spread of dust from hunting, transport, fuel and ash 6. Management ash storage area 7. The ash is the ash handling cases outside the eight. Employees must wear a noise during operation in areas with high volume. With positioning symbols or signs warning area, the ninth. Inspection and maintenance of the equipment and cause noise 10. Noisy equipment There must be a way to reduce the noise level sources, such as lubrication, reducing vibration. And closing the cover, etc. 11. The wall of sound provided 12. Provide project officials to inquire into the area surrounding the effects of noise that may occur from time to time funded projects 13. Vice-gatherers collect water used for manufacturing processes to meet throughout the summer. And the use of renewable effectively as possible 14. Provide a conduit surrounding the project area. The emphasis seems to be the area inside the 15. Check and drainage system in the project area on a regular basis every month. Yeah, if damaged, perform repairs, then finished by 16. Scoop out debris, waste, fuel rails, drainage grates and traps around the yard before the fuel into the drainage system, water treatment waste 17. Collect a fuel storage yard to wash login treated prior drain out of 18. Provide manholes should abandon the project. And extract and oil (Oil Separation) by the oil collected to send to the Agency for Management of industrial waste that has been authorized by the Department of Industry is to dispose of 19. Provide childcare facilities - out of the project to 20. Limited access to transport fuel vehicles. During a recent community to speed up. 30 km / h And speed control in general, according to the legal limit of 21. Training and staff involved in the construction of all kinds to follow traffic rules strictly 22. Provide adequate parking space transport fuel to keep the park out in the street 23. Record of accidents along the way to handle problems that may arise from transport fuels 24. Prepare the chassis support the more common solid waste projects before gathering sufficient to dispose of a further 25. Sort waste from the production process before a possible disposal. Or sent to the agency received dispose of industrial waste that has been authorized by the Department of Industry to be disposed of. (D) 26. Random chemical composition of the ash 1 time per year (the ash from the plant is likely to give farmers the soil) 27. The construction activities are hazardous waste must comply with the Ministry of Industry to dispose of waste or unused materials and 2548 (if any) 28. provide for the management of safety at work. The safe use of radiators. And safety systems in power plants. Compliance with the law stipulated 29. Provide coordination center to receive suggestions and complaints about the suffering they receive from the project 7.1 30. support the participation of the community - term action - CoP 31. operation. The public relations and social activities, as appropriate, together with a group of community stakeholders, the general public. And the relevant local authorities regularly claim sq Directors monitor the environmental impacts of electricity plants with installed capacity of less than 5 MW 1. Air pollution emitted from the chimney (Stack. ) o time measurement: When running at full capacity up (Full Load) normal (Normal. Operation) and the spewing soot (Soot Blow) o Index measurement: at least include total suspended particles (Total Suspended Particulate: TSP) o Frequency: 1 time per year Identify the amount of fuel and the moisture content of the fuel each time. Sensing a second. Volume measurements moment: When running at full capacity up (Full Load) normal (Normal Operation) o Parameter: Volume in general. (Maximum volume Volume and average 24 hours) and noise measurements for a period of at least three consecutive days at the port cover and holidays . Monitoring Stations: project area and neighboring communities from the source of the sound. Or where appropriate to the project, at least two stations Frequency: 1 time per year 3. Quality is leaving . Parameter: temperature, acidity - alkalinity (pH) suspended solids (SS) concentration of total suspended solids. (TDS) , BOD (BOD) and oil and grease (Oil & Grease) o Monitoring Stations: water collection pond treatment system before leaving. And the discharge water discharge outside the project area Frequency: 2 times a year covering the appropriate season four. Public opinion and stakeholders . Target: at least 1 km in radius or different from that prescribed. If the results were affected by a technical .
การแปล กรุณารอสักครู่..
