This thesis aims to study and improve the methods of work of the men and machines in the production process of sliding wood doors. A preliminary study found the problem is there waiting in the Assembly process, and have between moving machine frequently, so in this study, therefore, application, education, working in a factory to solve such problems. The first steps by researchers using the chart and the production process flow chart in the data record. Then perform an analysis to identify the cause of problems that have occurred with the Fishbone chart and technical questions: 5W-1H, then improves the way you work by using the ECRS used to troubleshoot issues that occur with all devices designed to help in transporting the wood to a different machine, then simulate the flow of a production process with sliding wooden doors and Promodel program analysis with Promodel program found that time spent on the production process, from the original series, the rest hour per hour 44.51 48.55 per set, which decreased 4.05 hours or 8.32%.
การแปล กรุณารอสักครู่..