The delivery date December 2557
. Project power plant waste Bodhi beauty
school managers. The company added vast wealth Group Limited 1999
.As the supplement 1999 vast wealth Group Limited. Hired to survey the area. จันต T. Bodhi beauty mobiles.Prachin Buri to store information construction and the altitude and how about tour เพื่อเป็นแนวทาง in design construction. Power plant waste Bodhi beauty by configure 0 altitude.000 casting horizontal coordinates and pins were 5 pins, according to documents attached
now exploration team did a survey completed and send the following items
-. Send map in the form Plan View in the form of paper sheet 4 scale
.- send map in the form Cros section paper sheet in the form 4
- send map in the form CD (Auto CAD 2002) 1 sets is studied to confirm
. Maj. นาวาตรี
(right dominant det Chung)
head set survey
.
การแปล กรุณารอสักครู่..