Due to the flooding occurred in the PA SAK River basin in flood season and water shortages in the summer, which occur annually. His Majesty's Royal irrigation Department, education initiative is thanop appropriate to build a dam to solve it. On February 19, all resolved 2532 (1989) basin in the lower part of the Chao Phraya River and Bangkok and vicinity as well until May 3 2537 (1994) Cabinet has approved construction of the dam project, open water catchment PA SAK River later to study the suitability and impact from the environment, [1]PA SAK jolasid dam construction took more than 5 years from September 30 to December 2 and 2542 (1999) 2537 (1994) ceremony potmrik catchment dam on June 15 2541 (1998) by King borom was Siam Royal Kumari ratchasuda Ratana came as Chairman and on October 7 2541 (1998) his Majesty granted extensions this dam as "PA SAK jolasid dam" dam "means an PA SAK River catchment, which effectively" [1]His Majesty's Royal H.R.H. Queen Sirikit Phra Borommarachininat, along with and the King of Siam was a Royal Highness ratchasuda Ratana he opened the PA SAK jolasid dam in November 25 2542 (1999) [3]
การแปล กรุณารอสักครู่..