Because
1 The remaining task is to produce a number of 400 pieces if they make in the morning without work because they have to wait for the new plating job wakoen (employee is not at work, plating)
2. after having stopped it, sister. Although the planned machine installation
3. Jobs waiting total capacity is 1200 8883 # =
. 8876 # = 1600
#8881 = 500
Total 3500
If, and average is 1500 OT open can be produced for about 2 days only.