I propose to add budget in a 25000/month.Detail is the A6 on the PC, the duration is 1 month and the position of the mobile IM5 duration 1 months (with another customer, Rotary label.)
I propose to increase the budget down. 25,000 / month, details of the A6 one-month period on the PC and the mobile IM5 period 1 month (rotating banners with other customers).
I offer a budget increase in down, is 25 000 / month.Detail is the position A6 on PC period 1 months and the IM5 on mobile period 1 months. (rotating sign with another customer).