Because of severe drought, because of fears of flooding or real?After the disaster happened in the year 2554 (2011), Office of policy and management of the water and a national disaster or a frog, has adapted the criteria to release water from the main dam to reduce the release of water from a dam in September and October, which is also known as "reservoir management criteria to manage flood, uncle," he said. Formerly a catchment basin management criteria commonlyTo reduce emissions during the months of September and October, which is the end of rainy season. This means that the water will be released in May and June (the rainy season), which is more than ever in order to prepare for the rainy season at the end of the season may be coming to a very unusual.In addition, master plan project management systems in order to solve the problem of floods and drought to lay strategies Committee 2555 (2012) system of management of the water resources or target kayon wrote. clearly, there is a short-term goal, namely to reduce the level of damage that may be caused by flooding last year 2555 (2012) and protection problems, such as flooding in the year 2554 (2011) or if flooding is affecting economic and social operations.
การแปล กรุณารอสักครู่..