Tambon tha ngio sideline. Tambon Nong Chang, Huai-Nang has sailed and the book of honour created a reservoir and water delivery systems. When used in a September 25 to 2532 agriculture and consumer, 22 villages. Office space, approximately 16,000 Rai of agricultural ratlekhathikan. books scroll. 005/13053. Down the irrigation Department to consider September 30 to 2532 ask when brought into the initiative, please communicate with Sesame. Department has to consider and there are books that kot 0301/903 down February 8 2533 ratlekhathikan reply that the area of representatives claim there are avenues, construction projects, reservoirs, canals, THA ngio deservedly brought when the project is kindly requested to communicate due to the initiative. Which Department will carry out a detailed feasibility study, explore, design, and construction, as appropriate, by the following urgent. Subsequently, the Office of ratlekhathikan have books scroll. 0005/3231. Down on March 2 that has taken that shelters chaengkrom 2533 when communicate Please note official King, then please, get reservoir projects tha ngio Canal project is on hold due to the initiative. Project characteristics Water pipeline construction with building water pipeline construction for line 1, 1 m in diameter with 8,800 meters length, building construction, pipeline, water, cable, 2 1 m diameter with length of 2,500 meters and a building construction, pipeline, water, cable, 3.1 m in diameter with length of 1,800 meters and a building. Operations: operation in the year 2540 budget completed 100%. The result benefits/outcomes of the project: Can help people tha ngio has the consumer in dry season areas benefits 5,200 acres households benefited 200 households, with water all year round.
การแปล กรุณารอสักครู่..
