In a case that has annulled concurrently in several User path must be selected each time the projector before the update files to the EPDM electrical because of the Electrical path from SolidWorks that only the last update.
In the case of simultaneous operation of several projects to choose a path before each User to update electrical files to SolidWorks Electrical EPDM due to the latest update from the path only.
In case of work at the same time, many project User must choose path every time before update electrical files to EPDM due SolidWorks Electrical from path at last update only